Access and scheduling
Give us the equipment list before the walkthrough, including model information and any maker instructions you already have. We compare machine dimensions with door openings, corridor turns, stairs, dock approaches, and any freight elevator's stated capacity. Stairs change the plan for heavy frames. Your building contact confirms loading hours, staging, and Certificate of Insurance needs.
At the destination, mark every machine's landing spot on the floor plan and identify which rooms the flooring contractor has released for moving traffic. Heavy units need a route with suitable surface protection and enough room to turn; a bare room is not necessarily a ready room. The equipment vendor's preparation visit comes before loading where the manufacturer requires it. Your manager chooses which stations remain in use.