Access and scheduling
Start with the table route at both addresses. We ask for doorway clear widths, hall turns, thresholds, elevator dimensions, and room corners. A floor plan may miss a door swing, so those measurements belong in the site walk. Your office manager provides table models and destination rooms; the servicing vendor provides model-specific moving instructions.
Appointments set the release time for each room. We can discuss an evening or weekend move on request, then place tables before reception pieces and cartons crowd the corridor. In a shared medical office building, management may require a loading reservation, elevator slot, floor protection, and a Certificate of Insurance. Your team confirms those rules at both suites. We reserve a path for the equipment technician to inspect tables after placement.

