Access and scheduling
Begin with services and events at both addresses. Your church decides whether worship continues in the old sanctuary, shifts to another room, or pauses. We can discuss evening or weekend work on request, but Saturday may conflict with a rehearsal or Sunday setup. Your facilities chair identifies when each old-room function ends and when the receiving room becomes available.
We walk the pew route with the contractor's release plan: sanctuary aisle, vestibule doors, steps, and truck position. The contractor needs room to unbolt, and the crew needs space to stage sections without blocking an active entrance. At the destination, your seating plan guides placement before smaller furnishings arrive. If a shared building requires a Certificate of Insurance or reserves a loading area, send those rules before scheduling. Your church controls access to worship spaces and rooms holding ceremonial items.