Access and scheduling
A submission deadline can leave one project table active while the rest of the studio is ready to move. Tell us which drawings, samples, and models must remain available through the final review. We can move the packed library and unused tables first, then place active work near its destination area. Your team sets the release point for each project; we schedule around it without choosing the current revision.
Building access matters for wide flat files and long model tables. We check doorways, elevator depth, loading access, and the route into the new studio before deciding whether a table needs to come apart. If either building requires a Certificate of Insurance or a freight elevator reservation, share its rules early. An evening or weekend window may suit a busy review calendar, subject to building availability. The plotter technician's visit belongs on the schedule so the machine is prepared before transport and set up after placement.


