Access and scheduling
The freight elevator is the schedule. Ask building management for its reservation rules, cab dimensions, load limit, approved cart route, and any time reserved for deliveries or other tenants. We use those details to decide what can ride assembled and what must be broken down. The receiving floor also needs a place to stage pieces while the crew clears the cab; otherwise each trip stops in the elevator doorway.
We confirm access to both suites for the full move window, including keys, badges, dock or service corridor doors, and the path back out after the last load. A Certificate of Insurance may be required before the building accepts the reservation. If your staff will occupy one area while another area moves, identify the hallways and doors that must stay open. Evening or weekend work can be discussed when the building allows it. The office manager approves the room map, and building management controls the common areas and elevator.